After the decoration of laboratory design, laboratory acceptance is a key link in laboratory construction. Most experiments After the completion of the room decoration construction, it is difficult to find the hidden dangers and defects. Our laboratory, based on the laboratory construction industry experience, sets such problems as the stage acceptance node to avoid quality out of control due to the omission of key quality control points. .

First, the basis of laboratory acceptance

1. Current national laws, regulations, rules and technical standards;

2. Relevant guidelines for the planning and construction of the laboratory industry;

3. Approved project establishment documents, contract documents, and engineering quantities list documents;

4. Approved laboratory design documents and corresponding engineering change documents;

5. Laboratory decoration construction drawings and technical specifications of main equipment, etc.;

6. The acceptance should also be based on the construction contract.

Two, the main content of laboratory acceptance

1. Check whether the project is constructed in accordance with the laboratory design drawings and contract list;

2. Check the appearance and construction quality of the completed project;

3. According to the laboratory design specifications and acceptance standards, carry out the whole experience and make suggestions for improvement;

4. Carry out acceptance inspection in accordance with certification/recognition standards, and put forward acceptance conclusions and suggestions for improvement;

5. Make an evaluation and acceptance report on the acceptance of the laboratory decoration project.

Three, laboratory acceptance process

1. Business negotiation, confirm cooperation;

2. Party A shall provide relevant contract design materials as the basis for acceptance;

3. Carry out on-site acceptance;

4. Submit acceptance conclusions and relevant opinions and suggestions.

Four. Detailed content of laboratory acceptance

1. Check on-site whether the laboratory benches, decoration, water and electricity, ventilation, general air conditioning, and purification air conditioning of the completed project are constructed in accordance with the construction contract and construction drawings. If there are centralized air supply and wastewater treatment and other related projects Within the scope of inspection.

2. According to the construction contract, the bill of quantities, and the technical description of the main equipment and materials, make a sensory evaluation of the overall appearance of the laboratory, check the list of engineering material brands, and confirm the equipment parameters.

3. Based on our laboratory design experience and construction experience, put forward a conclusion of the overall experience and acceptance of the laboratory project of Party A and give relevant suggestions.

4. According to the certification/recognition qualifications required by Party A, we will propose improvements to the deficiencies found in the laboratory acceptance process in accordance with the corresponding audit standards.

5. In summary, combined with the acceptance conclusions of all parties, a general acceptance report and improvement suggestions are proposed.

V. Specifications and standards for laboratory acceptance

1.JGJ 91-93 "Scientific Experimental Building Design Code"

2. Standard 127-2009 "Standards for the Construction of Centers for Disease Control and Prevention"

3.GB 50189-2015 "Design Standard for Energy Efficiency of Public Buildings"

4.GB 50016-2014 "Code for Fire Protection Design of Buildings"

5.DB 5005.7-94 "Code for Design of Building Lightning Protection"

6.GB 50019-2015 "Code for Design of Heating, Ventilation and Air Conditioning of Industrial Buildings"

7.GB 50073-2013 "Code for Design of Clean Workshops"

8.GB 50346-2011 "Technical Code for Building Biosafety Laboratories"

9.GB 19489-2008 "General Requirements for Laboratory Biosafety"

10.GB 14925-2010 "Laboratory Animal Environment and Facilities"

11.SN/1193-2003 "Genetic Testing Laboratory Technical Requirements" (obsolete)

12.GB 4972-84 "Basic Standard of Radiation Health Protection" (obsolete)

13.GB 8703-88 "Radiation Protection Regulations" (obsolete)

14.GB 8978-1996 "Integrated Wastewater Discharge Standard"

15.GB 16297-1996 "Comprehensive Emissions of Air Pollutants"

Back
Prev:Pure dry goods! Overall planning of textile laboratory construction
Next:Laboratory design risk case: Risks encountered in the design and layout of environmental reliability laboratory