The laboratory planning with excellent quality and service needs to design the laboratory layout according to the existing construction conditions based on the common opinions of the hospital's management person in charge, inspection management person in charge, and specialized technical personnel.
2021
-
03
-
29
Evaluation result: The protection level of the automated laboratory should not be lower than the requirements of the BSL-2 laboratory. In the actual design, the indicators of the laboratory fully meet the requirements of the BSL-2 laboratory, including clear signs, independent dressing rooms
2021
-
03
-
29
The heating test in the detection process is carried out in a room equipped with floor, wallpaper, and ceiling, which is not conducive to fire prevention and poses safety hazards. The meticulous decoration with such a high investment increases the cost of laboratory construction and decoration
2021
-
03
-
29
The main operations in this experimental area are the preparation of storage reagents, the dispensing of reagents and the preparation of the main reaction mixture. Reagents and materials used for sample preparation should be transported directly to this area and not through other areas.
2021
-
03
-
29
There are two ways to ventilate the laboratory, that is, partial exhaust and full room ventilation. Local exhaust is to discharge nearby harmful substances after they are produced. This method can discharge a large amount of harmful substances with less air volume, and is widely used in modern laboratories.
2021
-
03
-
29
Laboratory equipment planning generally includes an annual equipment procurement plan prepared according to laboratory requirements. The schedule should include quantity, performance requirements and amount, and indicate the source and time of purchase. The equipment planning has set and level issues, which are allocated according to different foundations and professional conditions.